23
Installation3
Fuel supply
Mounting position of the dosing pump
Always install the dosing pump with the delivery side
rising upwards.
Any mounting position over 15° is allowed, although a
mounting position between 15° and 35° is preferable.
1 Mounting position between 0° – 15° is not
allowed.
2 Preferred mounting position within the range
15° – 35°.
3 Mounting position within the range 35° – 90° is
allowed.
Permissible suction and delivery head of the
dosing pump
Delivery head from vehicle tank to dosing pump:
a = max. 3000 mm
Suction head in pressure-less vehicle tank:
b = max. 500 mm for petrol
b = max. 1000 mm for diesel
Suction head in a vehicle tank in which negative
pressure occurs during extraction (valve with 0.03 bar
in the tank cap):
b = max. 150 mm for petrol
b = max. 400 mm for diesel
Delivery head from the dosing pump to the heater:
c = Max. 2000 mm
Check the fuel tank vent line.
1 Connection at the heater
2 Max. fuel level
3 Min. fuel level
Please note!
Caution!
Safety instructions for installing the dosing pump!
• Always install the dosing pump with the delivery side
rising upwards – minimum slope 15°.
• Protect the dosing pump and filter from
impermissible heating, do not install near to silencers
and exhaust pipes.
Comments to this Manuals